14th Street Bridge Replacement over Cherry Creek & Cherry Creek Trail

Hamon Infrastructure, Inc. – 14th Street Bridge Replacement – Quality Assurance Testing, October, 2020 – April 2021, Denver, Colorado

Best Engineering was retained for quality assurance for constructional materials testing for Hamon Infrastructure who was the general contractor for the project. The project generally consisted of removal and replacement of the existing bridge on 14th Street at Speer Boulevard which spans Cherry Creek and the Cherry Creek Trail in Denver, Colorado. The project involved improvements to the bridge, which was constructed using reinforced concrete with asphalt pavement, as well as associated site improvements including removal and replacement of concrete sidewalk and curb and gutter. Best Engineering performed laboratory and field testing on the subgrade preparation, concrete, and asphalt pavement.